Detecting risks
before they become problems.
The Storage Guard is the analytics platform for large-scale battery energy storage systems (BESS). It analyses operational data at cell, module and system level, identifies risks at an early stage and provides transparency into the condition, performance and ageing of your assets.

Storage Guard
Many battery storage systems provide data - Few provide real insights
Battery storage systems, including large-scale BESS, generate more operational data today than ever before. At the same time, drawing the right conclusions from this data is becoming increasingly challenging. Critical developments at cell level, gradual performance losses or changes in battery condition often remain undetected for long periods. BMS data may reveal anomalies, but it does not always answer the key questions about their causes, risks and long-term impact. This creates uncertainty for operators, investors and asset managers when assessing, operating and strategically planning BESS assets.
Storage Guard answers the most critical questions about your battery storage system
Storage Guard collects, structures and analyses battery data at cell, module and system level. Combined with NOVUM’s analysis methods and battery expertise, this provides reliable insights into the risks, performance and ageing behaviour of BESS assets.
Enhanced safety
Critical issues become apparent before they result in failure, security problems, or downtime.
Enhanced performance
Performance deviations and inefficiencies can be identified, understood, and targeted directly.
Enhanced planning security
The state of health (SoH) and storage development are evaluated transparently and comprehensively.
Performance Guard
Continuously keeping performance and warranty conditions in view
Performance Guard monitors KPIs relevant to the warranty, such as efficiency, power output, cycle count, energy throughput, and capacity. The system independently verifies that the storage system delivers the promised performance and provides timely alerts before warranty conditions are violated.
Safety Guard
Predictive monitoring provides lead time for targeted protective measures
Safety Guard continuously monitors data at the cell, module, and rack levels. It detects unusual patterns early and indicates where safety-critical conditions may arise. It evaluates not just individual measurements, but also their trajectory and interplay. This allows potential root causes to be examined more closely before anomalies escalate.
Lifetime Guard
Operating profiles and stress factors shape the remaining useful life
Lifetime Guard tracks how the state of health of a battery storage system evolves during real-world operation. It reveals which stress factors accelerate degradation, helping operators make informed decisions regarding operations, warranties, and commercial strategies.
Engineering Services
Independent services for specific project needs
Not every technical issue requires continuous monitoring. Our engineering services provide targeted support during supplier selection, technical due diligence, acceptance testing, punch list generation, and root cause analysis—offering supplier qualification, FAT and SAT including KPI assessment, cell quality analysis, and operational data analysis.
NOVUM News

Large-format battery cells in BESS: Gaining ground in the market and put to the test at NOVUM
Up to 6.9 MWh in a single standard container: Large-format LFP cells exceeding 500 Ah are challenging the incumbent 314 Ah standard cells for market dominance. The value proposition sounds promising: they can reduce component counts, increase energy density at the system level, and lower initial integration costs. [1] However, this leap in scale raises several physical questions, as increasing dimensions escalate requirements for cooling, fire safety, and degradation control. Because we at NOVUM are already analyzing these new large-format cells in our quality assessments, we checked in with our battery experts: How much do we know about their design, behavior, and safety, what critical factors must be considered, and what does this mean for BESS procurement?

Commissioning is only the beginning
Utility-scale battery energy storage systems (BESS) are expected to deliver reliable performance over many years. Two European examples highlighted in pv magazine ESS News demonstrate just how closely long-term revenues are tied to technical obligations. For investors and operators, factoring long-term performance trends into account right from the planning stage is therefore essential.

Driving new energy systems with speed, courage, and pragmatism
With his company Energiesysteme Groß (ESG), Björn Groß built the first utility-scale battery energy storage system (BESS) in the Kassel region. In our interview, he revealed that he generally takes a "disruptive" approach. The solar industry is his home, and the whole world of renewable energy systems is his new domain. Bjön talks about his initial experiences with utility-scale BESS procurement, his motivations, and his future goals.





