Before regular operation

independently validate your storage system.

Many problems that arise during operation can be traced back to the selection, procurement and acceptance of a battery storage system. NOVUM compares technical specifications, verifies agreed performance indicators and helps project managers avoid poor decisions before regular operation begins.

Procurement & Commissioning

Poor decisions often only become apparent during storage system acceptance

Project managers select battery storage systems based on data sheets, warranty commitments, simulations and reference projects. At this stage, budgets, schedules and revenue targets are usually already defined. However, whether a system actually achieves the promised performance often only becomes clear after delivery or during acceptance testing. Missed performance indicators, technical limitations or delays affect the entire project. Revenues are delayed, additional tests require further effort, and clarifying responsibilities takes time.

Independent testing safeguards project quality

NOVUM supports battery storage projects from supplier selection through to the initial operational phase. Our experts assess technical documentation, review test results and compare the system’s actual behaviour with the agreed requirements. This enables project managers to document deviations, request corrective action and make informed decisions before unresolved technical issues lead to costly problems.

Support from procurement to commissioning

Different tests take center stage depending on the project phase

Qualified supplier comparison

Data sheets and manufacturer specifications often do not allow for a direct comparison. NOVUM verifies technical specifications, references, and performance promises. This makes decisive differences between suppliers visible.

 

Learn more

Independently verifying agreed-upon KPIs

During the Factory Acceptance Test (FAT) and the Site Acceptance Test (SAT), NOVUM verifies whether the storage system meets the agreed-upon requirements. Our experts accompany the tests, evaluate the measurement results, and check the defined performance metrics.

 

Learn more

Analyzing the initial operating cycles

Not every limitation becomes apparent during acceptance testing. NOVUM therefore analyzes the initial charge and discharge cycles and checks whether the system behavior aligns with the agreed-upon KPIs as well as the results from the FAT and SAT.

 

Learn more

“

Many delivery concepts on the market are still 'handmade' and unilaterally shift risks onto the operator. Having someone guide you through the contracts is money extremely well spent.

Jens Strebe Projektmanager Energy Farming

Jens Strebe

Project Manager | Energy Farming

Tim Wranika

Tim Wranika

Consultant

Entering commercial operation with verified project quality

Talk to our team about how NOVUM can independently verify and secure your storage project.

Schedule an appointment

NOVUM News

Discover more
Latest news, insights, and updates from NOVUM and the battery storage sector
Fünf blaue Batteriezellen unterschiedlicher Baugröße im direkten Größenvergleich in aufsteigender Reihenfolge.
Insights

Large-format battery cells in BESS: Gaining ground in the market and put to the test at NOVUM

Up to 6.9 MWh in a single standard container: Large-format LFP cells exceeding 500 Ah are challenging the incumbent 314 Ah standard cells for market dominance. The value proposition sounds promising: they can reduce component counts, increase energy density at the system level, and lower initial integration costs. [1] However, this leap in scale raises several physical questions, as increasing dimensions escalate requirements for cooling, fire safety, and degradation control. Because we at NOVUM are already analyzing these new large-format cells in our quality assessments, we checked in with our battery experts: How much do we know about their design, behavior, and safety, what critical factors must be considered, and what does this mean for BESS procurement?

Commissioning is only the beginning
Insights

Commissioning is only the beginning

Utility-scale battery energy storage systems (BESS) are expected to deliver reliable performance over many years. Two European examples highlighted in pv magazine ESS News demonstrate just how closely long-term revenues are tied to technical obligations. For investors and operators, factoring long-term performance trends into account right from the planning stage is therefore essential.

Björn Groß (ESG) steht vor einem geöffneten Batteriegroßspeicher mit sichtbaren Batteriemodulen und Racks.
Customer & Partner

Driving new energy systems with speed, courage, and pragmatism

With his company Energiesysteme Groß (ESG), Björn Groß built the first utility-scale battery energy storage system (BESS) in the Kassel region. In our interview, he revealed that he generally takes a "disruptive" approach. The solar industry is his home, and the whole world of renewable energy systems is his new domain. Bjön talks about his initial experiences with utility-scale BESS procurement, his motivations, and his future goals.