Skip to main content

Evaluating BESS suppliers

on a technical basis.

NOVUM evaluates BESS suppliers independently and on a sound technical basis. We verify whether manufacturer specifications, technical data, and supporting documentation align with the planned battery storage system and its intended use case. This provides you with a reliable foundation for supplier selection.

Supplier Qualification BESS NOVUM

Supplier Qualification

Similar KPIs do not mean identical system quality

When selecting a battery storage system, project developers often face multiple proposals with comparable performance metrics, warranties, and certificates. On paper, the systems look similar. Technically, however, they can differ significantly—for example, in cell technology, system design, safety concepts, integration capabilities, and manufacturer experience.

This raises critical questions: Are the promised performance values plausible? Do the system and supplier match the intended use case? Are certificates, references, and technical documentation reliable? And which vulnerabilities could later lead to delays, additional costs, or issues during acceptance testing and operation? Therefore, simply comparing prices and data sheets is not enough.

NOVUM verifies manufacturer claims

NOVUM evaluates providers, systems, and technical documentation based on project-specific criteria. Our battery experts do not just check whether the required information is present; they also assess whether the data is technically plausible, relevant to the project, and sufficiently documented.

If needed, operational data or cell quality analyses deepen the supplier evaluation. They provide additional insights into whether manufacturer claims and technical assumptions hold up under closer scrutiny.

This makes technical differences visible and providers transparently comparable, supporting informed decision-making in tenders, contract negotiations, and procurement processes.

Greater comparability

Technical differences become clear and transparent.

Reduced procurement risks

Vulnerabilities and missing documentation become visible early on.

Better-informed selection

The technical evaluation establishes a solid foundation for decision-making.

“

Relying solely on data sheets when purchasing storage systems is simply not enough. NOVUM qualified the hardware for us with hard facts.

Portrait of Reiner Borgmeyer, CEO Energy Farming

Reiner Borgmeyer

Founder & CEO | Energy Farming

Systematically qualifying BESS suppliers

NOVUM evaluates suppliers based on technical, qualitative, and project-specific criteria. The qualification process comprises the following steps:

We align project goals, use cases, technical requirements, and evaluation criteria together with you.

NOVUM evaluates data sheets, certificates, warranties, safety concepts, reference projects, and technical specifications.

Our battery experts categorize the results by plausibility, project suitability, and potential technical vulnerabilities. If documentation and evidence are insufficient, operational data analyses or cell quality analyses can complement the evaluation.

You receive a final report containing a technical assessment, prioritized risks, and actionable recommendations for further supplier selection.

Tim Wranika

Tim Wranika

Consultant

Which supplier is the right fit for your battery storage project?

Whether tender, proposal comparison, or technical due diligence: Our battery experts support you in evaluating providers on a sound technical basis.

Schedule an appointment

Storage Guard

BESS monitoring beyond the BMS

Conventional Battery Management Systems (BMS) and supervisory control systems (SCADA) provide operational data and reactive alerts. Storage Guard goes further: It analyzes technical anomalies in a manufacturer-independent manner down to the cell level and makes safety- and performance-relevant deviations visible. AI-powered algorithms detect patterns, while NOVUM battery experts contextualize their technical significance.

This creates a solid foundation for continuously evaluating and enhancing the safety, revenues, and lifespan of battery storage systems.

NOVUM News

Discover more
Latest news, insights, and updates from NOVUM and the battery storage sector
Fünf blaue Batteriezellen unterschiedlicher Baugröße im direkten Größenvergleich in aufsteigender Reihenfolge.
Insights

Large-format battery cells in BESS: Gaining ground in the market and put to the test at NOVUM

Up to 6.9 MWh in a single standard container: Large-format LFP cells exceeding 500 Ah are challenging the incumbent 314 Ah standard cells for market dominance. The value proposition sounds promising: they can reduce component counts, increase energy density at the system level, and lower initial integration costs. [1] However, this leap in scale raises several physical questions, as increasing dimensions escalate requirements for cooling, fire safety, and degradation control. Because we at NOVUM are already analyzing these new large-format cells in our quality assessments, we checked in with our battery experts: How much do we know about their design, behavior, and safety, what critical factors must be considered, and what does this mean for BESS procurement?

Commissioning is only the beginning
Insights

Commissioning is only the beginning

Utility-scale battery energy storage systems (BESS) are expected to deliver reliable performance over many years. Two European examples highlighted in pv magazine ESS News demonstrate just how closely long-term revenues are tied to technical obligations. For investors and operators, factoring long-term performance trends into account right from the planning stage is therefore essential.

Björn Groß (ESG) steht vor einem geöffneten Batteriegroßspeicher mit sichtbaren Batteriemodulen und Racks.
Customer & Partner

Driving new energy systems with speed, courage, and pragmatism

With his company Energiesysteme Groß (ESG), Björn Groß built the first utility-scale battery energy storage system (BESS) in the Kassel region. In our interview, he revealed that he generally takes a "disruptive" approach. The solar industry is his home, and the whole world of renewable energy systems is his new domain. Bjön talks about his initial experiences with utility-scale BESS procurement, his motivations, and his future goals.

Frequently Asked Questions

FAQ

Find answers to the most common questions regarding battery storage systems, operational data, storage requirements, and services.

NOVUM verifies whether warranty conditions are comprehensive, technically unambiguous, and aligned with planned operations. We evaluate specific KPIs—such as capacity, temperature limits, and internal resistance—refine vague wording, and highlight missing parameters. Additionally, we verify whether deviations are technically provable and whether the client has the necessary evidence to assert warranty or defect claims.

Yes. NOVUM evaluates specific manufacturer proposals based on all defined project-relevant criteria, such as technical suitability, system design, and submitted documentation. If multiple proposals are audited, this results in a transparent ranking for the specific project. The evaluation highlights strengths, weaknesses, and open items, serving as a well-founded basis for negotiations with manufacturers.

Yes. NOVUM engineering compares specific proposals based on individual project requirements and creates a technically sound evaluation. In doing so, we review factors such as the planned operating profile, technical specifications, and warranty conditions. The result is a manufacturer-independent contextualization of the offered systems with a clear recommendation for the specific project. We do not provide generic manufacturer recommendations, as every project has unique requirements and manufacturers offer different systems and configurations.

Yes, NOVUM engineering reviews technical and performance-related components of BESS contracts and tender documents. This includes evaluating performance guarantees, KPIs, and acceptance criteria. Based on this, NOVUM highlights potential risks and ambiguities and develops concrete technical recommendations for improvement. This service does not replace a legal contract review.