From factory to site:
verifying agreements.
NOVUM supports Factory Acceptance Tests (FAT) and Site Acceptance Tests (SAT) for BESS projects. We verify system functions, performance metrics, and technical documentation against the agreed specifications. This provides you with a sound basis for decision-making before the battery storage system enters commercial operation.

FAT & SAT
Technical quality is determined shortly before acceptance
When a battery storage system is delivered, installed, or commissioned, the project seems almost complete. But this is exactly when it becomes clear whether the specifications, contractual requirements, and actual technical condition align.
A test protocol alone does not provide certainty. Does the test design evaluate the critical KPIs? Are the measured values plausible? Do the Power Conversion System (PCS), Battery Management System (BMS), Energy Management System (EMS), safety concept, and communication interface function together seamlessly? And which deviations affect performance, safety, or availability?
If these questions remain unanswered during acceptance testing, the problems shift into the operational phase. Corrections become more complex, responsibilities harder to define, and commercial assumptions more uncertain.
NOVUM connects FAT and SAT, revealing where deviations occur
NOVUM supports FAT and SAT with technical battery expertise, structured testing criteria, and experience from real-world BESS projects. We do not just check whether a test was conducted. We evaluate whether the test setup and results align with the specifications, the intended use case, and the requirements of future operation.
The KPI assessment reveals which performance metrics are confirmed and where clarification or rework is needed. You receive a sound foundation for punch lists, follow-up claims, approval decisions, or further testing.
Clear acceptance
You can make a transparent decision on whether to approve the storage system or request rework.
Greater KPI transparency
You see which metrics have been confirmed and which supporting documents are still missing.
Fewer unresolved issues
You’ll identify early on what needs to be clarified and documented before commercial operation begins.
We review specifications, contracts, data sheets, test plans, and agreed performance KPIs.
We verify whether the planned tests can transparently prove relevant system functions and KPIs.
NOVUM observes key testing steps, validates results for plausibility, and identifies test-critical deviations.
You receive a technical evaluation with prioritized open items and actionable recommendations.
Storage Guard
BESS monitoring beyond the BMS
Conventional Battery Management Systems (BMS) and supervisory control systems (SCADA) provide operational data and reactive alerts. Storage Guard goes further: It analyzes technical anomalies in a manufacturer-independent manner down to the cell level and makes safety- and performance-relevant deviations visible. AI-powered algorithms detect patterns, while NOVUM battery experts contextualize their technical significance.
This creates a solid foundation for continuously evaluating and enhancing the safety, revenues, and lifespan of battery storage systems.
NOVUM News

Large-format battery cells in BESS: Gaining ground in the market and put to the test at NOVUM
Up to 6.9 MWh in a single standard container: Large-format LFP cells exceeding 500 Ah are challenging the incumbent 314 Ah standard cells for market dominance. The value proposition sounds promising: they can reduce component counts, increase energy density at the system level, and lower initial integration costs. [1] However, this leap in scale raises several physical questions, as increasing dimensions escalate requirements for cooling, fire safety, and degradation control. Because we at NOVUM are already analyzing these new large-format cells in our quality assessments, we checked in with our battery experts: How much do we know about their design, behavior, and safety, what critical factors must be considered, and what does this mean for BESS procurement?

Commissioning is only the beginning
Utility-scale battery energy storage systems (BESS) are expected to deliver reliable performance over many years. Two European examples highlighted in pv magazine ESS News demonstrate just how closely long-term revenues are tied to technical obligations. For investors and operators, factoring long-term performance trends into account right from the planning stage is therefore essential.

Driving new energy systems with speed, courage, and pragmatism
With his company Energiesysteme Groß (ESG), Björn Groß built the first utility-scale battery energy storage system (BESS) in the Kassel region. In our interview, he revealed that he generally takes a "disruptive" approach. The solar industry is his home, and the whole world of renewable energy systems is his new domain. Bjön talks about his initial experiences with utility-scale BESS procurement, his motivations, and his future goals.