Skip to main content

From factory to site:

verifying agreements.

NOVUM supports Factory Acceptance Tests (FAT) and Site Acceptance Tests (SAT) for BESS projects. We verify system functions, performance metrics, and technical documentation against the agreed specifications. This provides you with a sound basis for decision-making before the battery storage system enters commercial operation.

FAT und SAT eines Batteriespeichers

FAT & SAT

Technical quality is determined shortly before acceptance

When a battery storage system is delivered, installed, or commissioned, the project seems almost complete. But this is exactly when it becomes clear whether the specifications, contractual requirements, and actual technical condition align.

A test protocol alone does not provide certainty. Does the test design evaluate the critical KPIs? Are the measured values plausible? Do the Power Conversion System (PCS), Battery Management System (BMS), Energy Management System (EMS), safety concept, and communication interface function together seamlessly? And which deviations affect performance, safety, or availability?

If these questions remain unanswered during acceptance testing, the problems shift into the operational phase. Corrections become more complex, responsibilities harder to define, and commercial assumptions more uncertain.

NOVUM connects FAT and SAT, revealing where deviations occur

NOVUM supports FAT and SAT with technical battery expertise, structured testing criteria, and experience from real-world BESS projects. We do not just check whether a test was conducted. We evaluate whether the test setup and results align with the specifications, the intended use case, and the requirements of future operation.

The KPI assessment reveals which performance metrics are confirmed and where clarification or rework is needed. You receive a sound foundation for punch lists, follow-up claims, approval decisions, or further testing.

Clear acceptance

You can make a transparent decision on whether to approve the storage system or request rework.

Greater KPI transparency

You see which metrics have been confirmed and which supporting documents are still missing.

Fewer unresolved issues

You’ll identify early on what needs to be clarified and documented before commercial operation begins.

Systematically supporting FAT and SAT

NOVUM supports the acceptance tests from preparation through execution to evaluation and documents relevant deviations. The process comprises the following steps:

We review specifications, contracts, data sheets, test plans, and agreed performance KPIs.

We verify whether the planned tests can transparently prove relevant system functions and KPIs.

NOVUM observes key testing steps, validates results for plausibility, and identifies test-critical deviations.

You receive a technical evaluation with prioritized open items and actionable recommendations.

Tim Wranika

Tim Wranika

Consultant

Preparing for FAT, SAT, or commissioning?

NOVUM supports you in evaluating test results, KPIs, and technical documentation on a sound technical basis. This ensures your acceptance decision is not made solely on the basis of a test report.

Schedule an appointment

Storage Guard

BESS monitoring beyond the BMS

Conventional Battery Management Systems (BMS) and supervisory control systems (SCADA) provide operational data and reactive alerts. Storage Guard goes further: It analyzes technical anomalies in a manufacturer-independent manner down to the cell level and makes safety- and performance-relevant deviations visible. AI-powered algorithms detect patterns, while NOVUM battery experts contextualize their technical significance.

This creates a solid foundation for continuously evaluating and enhancing the safety, revenues, and lifespan of battery storage systems.

NOVUM News

Discover more
Latest news, insights, and updates from NOVUM and the battery storage sector
Fünf blaue Batteriezellen unterschiedlicher Baugröße im direkten Größenvergleich in aufsteigender Reihenfolge.
Insights

Large-format battery cells in BESS: Gaining ground in the market and put to the test at NOVUM

Up to 6.9 MWh in a single standard container: Large-format LFP cells exceeding 500 Ah are challenging the incumbent 314 Ah standard cells for market dominance. The value proposition sounds promising: they can reduce component counts, increase energy density at the system level, and lower initial integration costs. [1] However, this leap in scale raises several physical questions, as increasing dimensions escalate requirements for cooling, fire safety, and degradation control. Because we at NOVUM are already analyzing these new large-format cells in our quality assessments, we checked in with our battery experts: How much do we know about their design, behavior, and safety, what critical factors must be considered, and what does this mean for BESS procurement?

Commissioning is only the beginning
Insights

Commissioning is only the beginning

Utility-scale battery energy storage systems (BESS) are expected to deliver reliable performance over many years. Two European examples highlighted in pv magazine ESS News demonstrate just how closely long-term revenues are tied to technical obligations. For investors and operators, factoring long-term performance trends into account right from the planning stage is therefore essential.

Björn Groß (ESG) steht vor einem geöffneten Batteriegroßspeicher mit sichtbaren Batteriemodulen und Racks.
Customer & Partner

Driving new energy systems with speed, courage, and pragmatism

With his company Energiesysteme Groß (ESG), Björn Groß built the first utility-scale battery energy storage system (BESS) in the Kassel region. In our interview, he revealed that he generally takes a "disruptive" approach. The solar industry is his home, and the whole world of renewable energy systems is his new domain. Bjön talks about his initial experiences with utility-scale BESS procurement, his motivations, and his future goals.

Frequently Asked Questions

FAQ

Find answers to the most common questions regarding battery storage systems, operational data, storage requirements, and services.

NOVUM can analyze operational data from the trial operation and verify whether agreed performance metrics and technical requirements are met. This allows deviations to be identified, documented, and evaluated technically. The exact scope of services is determined based on the project phase, the available data foundation, and the agreed acceptance criteria.

NOVUM engineering uses defined acceptance tests to verify whether a BESS achieves the contractually agreed performance metrics. To do this, we compare test and operational data with the guaranteed KPIs, such as capacity, power output, and efficiency. Because we analyze data down to the cell level, we also detect hidden anomalies that are not visible in aggregated system data and could later lead to performance losses. Deviations are transparently documented and technically contextualized.

NOVUM provides support during the preparation, execution, and technical evaluation of Factory Acceptance Tests (FAT) and Site Acceptance Tests (SAT). To achieve this, we define relevant testing criteria and performance KPIs, evaluate the test results, and document deviations. This establishes an independent basis for the technical acceptance of the battery storage system.

The Factory Acceptance Test (FAT) verifies the BESS or its components at the manufacturer's facility prior to delivery. The Site Acceptance Test (SAT) takes place after installation and during commissioning at the final deployment site, evaluating the interplay of the overall system under real-world conditions. Both tests help to identify and transparently document technical deviations before commercial operation begins.