SAT

A Site Acceptance Test (SAT) verifies a battery energy storage system after it has been installed at its final location. It is generally conducted during commissioning and before final acceptance. The test examines the interaction between system components, interfaces, control functions, communication and safety functions under actual operating conditions. Depending on the contract, performance indicators such as capacity, efficiency, response time or power output may also be verified. The results and any deviations are documented and compared with the agreed requirements.