Delivering Performance Over Many Years
200 MW of power, 800 MWh of capacity, and an expected operational lifespan of more than 20 years: Greenvolt has commissioned a major project in Poland with the Turośń Kościelna storage facility. According to pv magazine, the asset will participate in the Polish capacity market starting in 2028. The contract spans 17 years and entails a 170 MW capacity obligation. [1]
These figures describe two distinct aspects of the project: its baseline technical specifications and the performance it must deliver over the long term. Consequently, understanding how the BESS behaves and degrades during real-world operation is critical for technical evaluation.
Verifying Technical Assumptions
Greenvolt reports extensive testing and close collaboration with the transmission system operator (TSO). This enabled the company to validate technical assumptions in practice. In addition, documentation and technical specifications continued to evolve throughout project implementation. [1]
At NOVUM, pre-commissioning testing and subsequent battery data analytics go hand in hand. Acceptance tests evaluate whether a BESS satisfies specified requirements at project launch. During ongoing operations, the focus shifts to condition, performance, and degradation. This approach allows long-term operational trends to be directly benchmarked against initial baseline data.
Preserving Storage Performance Long Term
Another example comes from the UK's Long-Duration Energy Storage (LDES) program. The energy regulator, Ofgem, has established a cap-and-floor mechanism. If revenues fall below the agreed floor, the storage asset receives top-up payments. If revenues exceed the cap, excess returns must be paid back. This model aims to de-risk investment through more predictable revenue streams. [2]
The technical requirements extend far beyond initial commissioning: to qualify for the program, projects had to prove they can discharge for at least eight hours and maintain this capability across the entire contract term. [3] While conventional battery storage systems are typically designed for short 1- to 2-hour cycles, long-duration energy storage systems must reliably discharge power for 8 to 18 consecutive hours to support the grid during extended periods of low renewable generation.
The provisional shortlist also includes lithium-ion projects offering discharge durations of around 16 to 18 hours. As of the 2026 issue, final decisions were still pending, with contract offers detailing the final terms and conditions under preparation. [2][3][4]
From our perspective, the technical advisory for such projects requires evaluating usable capacity degradation directly in conjunction with committed discharge power and duration. Acceptance testing provides the baseline; ongoing operational evaluation carries this analysis forward.
Factoring Operations into Planning Early On
The examples from Poland and the UK are based on different contractual frameworks. However, both clearly illustrate why technical evaluation must always account for the years following commissioning.
Investors and operators should define early on the precise power output and discharge duration their BESS must deliver over the long term. Documented test results at project launch form the foundation for tracking subsequent degradation. Once operational, continuous monitoring is vital to evaluate changes in condition and performance, ensuring they remain aligned with project requirements.
Supporting Utility-Scale BESS Across the Asset Lifecycle
NOVUM supports investors and operators from Supplier Qualification through Factory Acceptance Testing (FAT) and Site Acceptance Testing (SAT) to continuous battery analytics powered by Storage Guard. We bridge pre-commissioning evaluation with real-time analysis of condition, performance, and degradation during ongoing operation.
Looking to inspect your utility-scale BESS prior to commissioning or evaluate its operational performance in real time? Get in touch with us today. We support your project from day one.
References
[1] Patrick Jowett: “Greenvolt’s battery bet on Poland,” pv magazine ESS News, September 2026, p. 20.
[2] Matthew Lynas: “Ofgem intervenes on LDES,” pv magazine ESS News, September 2026, p. 5.
[3] Matthew Lynas: “Ofgem intervenes on LDES,” pv magazine ESS News, September 2026, p. 6.
[4] Matthew Lynas: “Ofgem intervenes on LDES,” pv magazine ESS News, September 2026, p. 4.
The connection to NOVUM and the recommendations for technical monitoring represent our editorial assessment. The expected operational lifespan does not constitute a lifetime warranty; the UK requirements apply specifically to the program described.
NOVUM News

Large-format battery cells in BESS: Gaining ground in the market and put to the test at NOVUM
Up to 6.9 MWh in a single standard container: Large-format LFP cells exceeding 500 Ah are challenging the incumbent 314 Ah standard cells for market dominance. The value proposition sounds promising: they can reduce component counts, increase energy density at the system level, and lower initial integration costs. [1] However, this leap in scale raises several physical questions, as increasing dimensions escalate requirements for cooling, fire safety, and degradation control. Because we at NOVUM are already analyzing these new large-format cells in our quality assessments, we checked in with our battery experts: How much do we know about their design, behavior, and safety, what critical factors must be considered, and what does this mean for BESS procurement?

Commissioning is only the beginning
Utility-scale battery energy storage systems (BESS) are expected to deliver reliable performance over many years. Two European examples highlighted in pv magazine ESS News demonstrate just how closely long-term revenues are tied to technical obligations. For investors and operators, factoring long-term performance trends into account right from the planning stage is therefore essential.

Driving new energy systems with speed, courage, and pragmatism
With his company Energiesysteme Groß (ESG), Björn Groß built the first utility-scale battery energy storage system (BESS) in the Kassel region. In our interview, he revealed that he generally takes a "disruptive" approach. The solar industry is his home, and the whole world of renewable energy systems is his new domain. Bjön talks about his initial experiences with utility-scale BESS procurement, his motivations, and his future goals.